Urb. Isla de Valdecañas

Details:

  • First project developed outside Madrid
  • Total execution time: 2 months.
  • Typology of Facilities: Very high qualities and details very careful, functionality and warmth. New layout.
  • 160 m2 in which HERRAGON acts as the main contractor executing:
    • Masonry.
    • Carpentry of wood, metal and locksmith.
    • Floors and False ceilings.
    • Sanitary instalation.
    • Electrical installation and ilummination.
    • Air conditioning installation.
    • Design - Kitchen

 