Castellana 170 Lawyers

Comprehensive fitting out of the office.

Details:

  • Total execution time: 1.5 weeks.
  • Typology of Facilities: Very high quality and very careful details, functional
    60 m2 in which HERRAGON executes:

-Wood carpentry, metal and locksmith.
-Paints and coatings.
-Flooring and False Ceilings.
-Air conditioning installation.
-Electrical installation.
-Painting.