Mauricio Legendre 16

Details:

Total execution time: 4 months.

Typology of Facilities: Very high qualities and details very careful, functionality and warmth.

180m2 in which HERRAGON designs and executes the project in its entirety, both the reform and the new construction annexes, as well as the exteriors (pool and rear and front patio):

  • Foundations castings
  • Foundation
  • Brickwork
  • Wood carpentry, metal and locksmith.
  • Flooring and False Ceilings
  • Sanitary instalation
  • Electrical installation and lighting
  • Air conditioning installation (aerothermal)
  • Design
  • Kitchen

 

INITIAL STATE

  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16

 


FINAL STATE

  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16
  • obra Mauricio Legendre 16